Bid # 19027 – ARC Boiler Replacement Phase 2

The work shall consist of, but not limited to remove existing boilers B-2 and B-3. Remove existing boiler pumps B-2, B-3, C-2 and C-3. Remove all associated piping and controls. Install District provided new boiler (B-3), provide and install infrastructure for future boiler B-2. Provide and install new pumps HWP-3, HWP-4 and HWP-5, new air separator, new 12 inch hot water piping loop and associated piping for the new pumps, gas and drain piping as required and all associated work shown in the contract documents.

Additional Project Requirements – Coordinate all work to insure that Boiler #1 shall be fully operational not later than October 18, 2019.

APN# 28500900260000.


Bid Details

  • Open Notice Date: August 2, 2019
  • Closing Date and Time: August 22, 2019
  • Status: All bids rejected